Advertisement
Advertisement

Success factors in brownfield modification

Utilisation of existing infrastructure to develop new, smaller fields in mature areas often requires modification to host installations. Modifications are complex, as space, weight and capacity on board is limited, and because they are often carried out on installations in production. How can we remove uncertainties associated with modifications costs?

Speakers and topics

PSO mechanical connector
Jan Tore Fjelland, Product Manager Offshore
PSO

Connectors for critical & permanent applications
Ross Davidson, Business Development Director
Poulton Technologies 

AOGV – new method of valve and flange isolation
Kenneth RosŽén, Department Manager
IK-Norway

Fit-for-purpose visualization
Peter Baxter, Director USA
Visco 

Turning dispatched geometric data into a replica
Randi Stray, Production Manager
Visco Computer Graphics

A giant step forward for subsea structural repair
Hans Peter Fuglesang, Chairman of the board
Fuglesangs

 

Moderator: Marie Ravnestad, Area Operations Manager Skarv, AkerBP

 

Main Sponsor Technical Sessions:

Supporting Sponsor Technical Sessions: